Facility Expansion

2022 marks a turning point for Furlong Steel. Having outgrown the shop that was our home for fourteen years, we are excited to share that we recently expanded into a 82,000 square foot facility. Resting on 11.5 acres, this space allows us to offer more services and increase capacity for our clients. We remain in the southeast Foothills Industrial area, with easy access to all major city roadways.

You can find us at 3005 Shephard Place SE Calgary, AB.

Featuring:

68,500 square feet of indoor shop space
3.3 acres of yard / laydown space
20 overhead cranes, ranging from 5-30 tons each
4 distinct shops – structural steel, pressure pipe, stainless steel, blast & paint
11 overhead doors – up to 28’ wide
65-ton Iron Worker
Plasma torch, CNC table
18″ vertical mitre saw with 100’ rollers

Contact Form